2018-06-08 - Information from Hillgreen, Lane & Co. opus list, compiled by Bynum Petty<br> Contract: January 1911<br> Tubular-pneumatic action<br> Water motor<br> Price: $2,200<br> In 1920, an electric blower was added.<br> In 1926, a detached console, electro-pneumatic action, and a DC generator were installed.<br> -Database Manager
Regrettably, it is not possible to display the information about the sponsor of this pipeorgandatabase entry or if there is a sponsor. Please see About Sponsors on Pipe Organ Database.